Renewable sitesBrookfield Farm AD Plant (Farm AD)

Brookfield Farm AD Plant (Farm AD)

Brookfield Farm AD Plant (Farm AD) is an operational 1.3 MW anaerobic digestion plant in Stafford, generating since 1 May 2010. Planning permission was granted on 1 May 2009, 3 months after submission. Operator of record: Private Developer.

1.3 MW
Capacity
as recorded in REPD
Operational
Status
since 1 May 2010
Anaerobic Digestion
Technology
Private Developer
Stafford
Authority
England

Planning and build timeline

Application submitted9 February 2009
Permission granted1 May 2009
3 months after submission
Operational1 May 2010
12 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Stafford: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Brookfield Farm AD Plant (Farm AD)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
0.269 km
Biomass (dedicated) · Operational
2.611.1 km
Wind Onshore · Operational
411.2 km
Solar Photovoltaics · Operational
8.212 km
EfW Incineration · Operational
2313.6 km
Solar Photovoltaics · Under Construction
2513.7 km
Battery · Under Construction
13.7 km
Solar Photovoltaics · Operational
1.813.8 km

How big is Brookfield Farm AD Plant (Farm AD)?

Brookfield Farm AD Plant (Farm AD) has a recorded installed capacity of 1.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Brookfield Farm AD Plant (Farm AD)?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Brookfield Farm AD Plant (Farm AD) approved and built?

The application was submitted on 9 February 2009. Permission was granted on 1 May 2009, 3 months later. The site became operational on 1 May 2010, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 228.