Novarly ParcelRenewable sites

Renewable sitesStafford Leisure Centre, Lammascote Road - Solar Panels

Stafford Leisure Centre, Lammascote Road - Solar Panels

Stafford Leisure Centre, Lammascote Road - Solar Panels is under construction in Stafford with a recorded capacity of 0.26 MW.

0.26 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Stafford Leisure Centre
Stafford
Authority
England

Planning and build timeline

Application submitted2024-10-18
Permission granted2024-12-13
2 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stafford’s record on solar

Stafford has decided 14 solar farms and approved 86%, taking a median of 2.2 months. See every solar farm decision in Stafford

Other built sites within 15 km

SiteMWDistance
Brookfield Farm AD Plant (Farm AD)
Anaerobic Digestion · Operational
1.39 km
Rodbaston
Wind Onshore · Operational
411.5 km
Eccleshall Biomass
Biomass (dedicated) · Operational
2.612.1 km
Meece Landfill
Landfill Gas · Operational
1.313.1 km
Four Ashes EfW
EfW Incineration · Operational
2314.7 km

How big is Stafford Leisure Centre, Lammascote Road - Solar Panels?

Stafford Leisure Centre, Lammascote Road - Solar Panels has a recorded installed capacity of 0.26 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Stafford Leisure Centre, Lammascote Road - Solar Panels?

REPD records the operator as Stafford Leisure Centre. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Stafford Leisure Centre, Lammascote Road - Solar Panels approved and built?

The application was submitted on 2024-10-18. Permission was granted on 2024-12-13, 2 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 17406.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council