Renewable sitesStafford Leisure Centre, Lammascote Road - Solar Panels

Stafford Leisure Centre, Lammascote Road - Solar Panels

Stafford Leisure Centre, Lammascote Road - Solar Panels is a 0.26 MW solar farm under construction in Stafford. Planning permission was granted on 13 December 2024, 2 months after submission. Operator of record: Stafford Leisure Centre.

0.26 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Stafford Leisure Centre
Stafford
Authority
England

Planning and build timeline

Application submitted18 October 2024
Permission granted13 December 2024
2 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Stafford approves 86% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Stafford Leisure Centre, Lammascote Road - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stafford’s record on solar

Stafford has decided 14 solar farms and approved 86%, taking a median of 2.2 months. See every solar farm decision in Stafford

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
1.39 km
Wind Onshore · Operational
411.5 km
Biomass (dedicated) · Operational
2.612.1 km
Landfill Gas · Operational
1.313.1 km
EfW Incineration · Operational
2314.7 km

How big is Stafford Leisure Centre, Lammascote Road - Solar Panels?

Stafford Leisure Centre, Lammascote Road - Solar Panels has a recorded installed capacity of 0.26 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Stafford Leisure Centre, Lammascote Road - Solar Panels?

REPD records the operator as Stafford Leisure Centre. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Stafford Leisure Centre, Lammascote Road - Solar Panels approved and built?

The application was submitted on 18 October 2024. Permission was granted on 13 December 2024, 2 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 17406.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode