Broadditch Battery Energy

Broadditch Battery Energy is operational in Dartford with a recorded capacity of 11 MW, and has been generating since 2023-03-01.

11 MW
Capacity
as recorded in REPD
Operational
Status
since 2023-03-01
Battery
Technology
Harmony Energy
Dartford
Authority
England

Planning and build timeline

Application submitted2018-05-14
Permission granted2018-08-16
3 months after submission
Operational2023-03-01
54 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dartford’s record on battery storage

Dartford has decided 5 battery storage schemes and approved 80%, taking a median of 5.2 months. See every battery storage scheme decision in Dartford

Other built sites within 15 km

SiteMWDistance
St Margaret's Farm - Green Waste Composting Facility
Biomass (dedicated) · Under Construction
4.9 km
Tilbury Docks
Wind Onshore · Operational
124.9 km
Tilbury Green Power
Biomass (dedicated) · Operational
435.4 km
Thurrock Flexible Generation Plant
Battery · Operational
1506.2 km
Tilbury LCY2
Solar Photovoltaics · Operational
46.3 km
London Distribution Park
Battery · Operational
3.86.3 km
Littlebrook Battery Storage
Battery · Operational
7.57.5 km
Longreach STW - extension
Sewage Sludge Digestion · Operational
1.18.9 km

How big is Broadditch Battery Energy?

Broadditch Battery Energy has a recorded installed capacity of 11 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Broadditch Battery Energy?

REPD records the operator as Harmony Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Broadditch Battery Energy approved and built?

The application was submitted on 2018-05-14. Permission was granted on 2018-08-16, 3 months later. The site became operational on 2023-03-01, 54 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 20328.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council