Broadditch Battery Energy is an operational 11 MW battery storage site in Dartford, generating since 1 March 2023. Planning permission was granted on 16 August 2018, 3 months after submission. Operator of record: Harmony Energy.

11 MW
Capacity
as recorded in REPD
Operational
Status
since 1 March 2023
Battery
Technology
Harmony Energy
Dartford
Authority
England

Planning and build timeline

Application submitted14 May 2018
Permission granted16 August 2018
3 months after submission
Operational1 March 2023
54 months after consent

Screening a site of your own?

RedlineUK · £39

Dartford approves 80% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Broadditch Battery Energy’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dartford’s record on battery storage

Dartford has decided 5 battery storage schemes and approved 80%, taking a median of 5.2 months. See every battery storage scheme decision in Dartford

Other built sites within 15 km

SiteMWDistance
Biomass (dedicated) · Under Construction
4.9 km
Wind Onshore · Operational
124.9 km
Biomass (dedicated) · Operational
435.4 km
Battery · Operational
1506.2 km
Solar Photovoltaics · Operational
46.3 km
Battery · Operational
3.86.3 km
Battery · Operational
7.57.5 km
Sewage Sludge Digestion · Operational
1.18.9 km

How big is Broadditch Battery Energy?

Broadditch Battery Energy has a recorded installed capacity of 11 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Broadditch Battery Energy?

REPD records the operator as Harmony Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Broadditch Battery Energy approved and built?

The application was submitted on 14 May 2018. Permission was granted on 16 August 2018, 3 months later. The site became operational on 1 March 2023, 54 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 20328.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode