Renewable sitesSt Margaret's Farm - Green Waste Composting Facility

St Margaret's Farm - Green Waste Composting Facility

St Margaret's Farm - Green Waste Composting Facility is a biomass plant under construction in Dartford. Planning permission was granted on 19 March 2020, 4 months after submission. Operator of record: South Darenth Farms & Cold Store Company Limited.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Biomass (dedicated)
Technology
South Darenth Farms & Cold Store Company Limited
Dartford
Authority
England

Planning and build timeline

Application submitted14 November 2019
Permission granted19 March 2020
4 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Dartford: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with St Margaret's Farm - Green Waste Composting Facility’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Battery · Operational
114.9 km
Battery · Operational
7.55.5 km
Sewage Sludge Digestion · Operational
1.16.5 km
Wind Onshore · Operational
127.5 km
Biomass (dedicated) · Operational
438.4 km
Solar Photovoltaics · Operational
49.1 km
Battery · Operational
3.89.1 km
Landfill Gas · Operational
1710 km

How big is St Margaret's Farm - Green Waste Composting Facility?

REPD does not record an installed capacity for St Margaret's Farm - Green Waste Composting Facility.

Who operates St Margaret's Farm - Green Waste Composting Facility?

REPD records the operator as South Darenth Farms & Cold Store Company Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was St Margaret's Farm - Green Waste Composting Facility approved and built?

The application was submitted on 14 November 2019. Permission was granted on 19 March 2020, 4 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10216.