Thurrock Flexible Generation Plant

Thurrock Flexible Generation Plant is an operational 150 MW battery storage site in England. Planning permission was granted on 16 February 2022, 20 months after submission. Operator of record: Thurrock Power.

150 MW
Capacity
as recorded in REPD
Operational
Status
no operational date
Battery
Technology
Thurrock Power
National
Authority
England

Planning and build timeline

Application submitted10 June 2020
Permission granted16 February 2022
20 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Thurrock Flexible Generation Plant’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

The Planning Inspectorate - National Infrastructure’s record on battery storage

The Planning Inspectorate - National Infrastructure has decided 19 battery storage schemes and approved 100%, taking a median of 17.4 months. See every battery storage scheme decision in The Planning Inspectorate - National Infrastructure

Other built sites within 15 km

SiteMWDistance
Biomass (dedicated) · Operational
432.4 km
Solar Photovoltaics · Operational
42.4 km
Battery · Operational
3.82.4 km
Solar Photovoltaics · Operational
53.2 km
Wind Onshore · Operational
123.3 km
Landfill Gas · Operational
3.84.9 km
Landfill Gas · Operational
3.94.9 km
Battery · Operational
116.2 km

How big is Thurrock Flexible Generation Plant?

Thurrock Flexible Generation Plant has a recorded installed capacity of 150 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Thurrock Flexible Generation Plant?

REPD records the operator as Thurrock Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Thurrock Flexible Generation Plant approved and built?

The application was submitted on 10 June 2020. Permission was granted on 16 February 2022, 20 months later. REPD does not record an operational date.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7696.