Thurrock Flexible Generation Plant is operational in England with a recorded capacity of 150 MW.

150 MW
Capacity
as recorded in REPD
Operational
Status
no operational date
Battery
Technology
Thurrock Power
National
Authority
England

Planning and build timeline

Application submitted2020-06-10
Permission granted2022-02-16
20 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

The Planning Inspectorate - National Infrastructure’s record on battery storage

The Planning Inspectorate - National Infrastructure has decided 19 battery storage schemes and approved 100%, taking a median of 17.4 months. See every battery storage scheme decision in The Planning Inspectorate - National Infrastructure

Other built sites within 15 km

SiteMWDistance
Tilbury Green Power
Biomass (dedicated) · Operational
432.4 km
London Distribution Park
Battery · Operational
3.82.4 km
Tilbury LCY2
Solar Photovoltaics · Operational
42.4 km
Barvills Solar Farm
Solar Photovoltaics · Operational
53.2 km
Tilbury Docks
Wind Onshore · Operational
123.3 km
Mucking Gas 2 Landfill Scheme
Landfill Gas · Operational
3.84.9 km
Mucking Gas 3 Landfill Scheme
Landfill Gas · Operational
3.94.9 km
Broadditch Battery Energy
Battery · Operational
116.2 km

How big is Thurrock Flexible Generation Plant?

Thurrock Flexible Generation Plant has a recorded installed capacity of 150 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Thurrock Flexible Generation Plant?

REPD records the operator as Thurrock Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Thurrock Flexible Generation Plant approved and built?

The application was submitted on 2020-06-10. Permission was granted on 2022-02-16, 20 months later. REPD does not record an operational date.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7696.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council