Thurrock Flexible Generation Plant is an operational 150 MW battery storage site in England. Planning permission was granted on 16 February 2022, 20 months after submission. Operator of record: Thurrock Power.
Planning and build timeline
| Application submitted | 10 June 2020 |
| Permission granted | 16 February 2022 20 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Thurrock Flexible Generation Plant’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
The Planning Inspectorate - National Infrastructure’s record on battery storage
The Planning Inspectorate - National Infrastructure has decided 19 battery storage schemes and approved 100%, taking a median of 17.4 months. See every battery storage scheme decision in The Planning Inspectorate - National Infrastructure →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Biomass (dedicated) · Operational | 43 | 2.4 km |
Solar Photovoltaics · Operational | 4 | 2.4 km |
Battery · Operational | 3.8 | 2.4 km |
Solar Photovoltaics · Operational | 5 | 3.2 km |
Wind Onshore · Operational | 12 | 3.3 km |
Landfill Gas · Operational | 3.8 | 4.9 km |
Landfill Gas · Operational | 3.9 | 4.9 km |
Battery · Operational | 11 | 6.2 km |
How big is Thurrock Flexible Generation Plant?
Thurrock Flexible Generation Plant has a recorded installed capacity of 150 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Thurrock Flexible Generation Plant?
REPD records the operator as Thurrock Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Thurrock Flexible Generation Plant approved and built?
The application was submitted on 10 June 2020. Permission was granted on 16 February 2022, 20 months later. REPD does not record an operational date.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7696.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode