Renewable sites › Tilbury LCY2
Tilbury LCY2
Tilbury LCY2 is operational in Thurrock with a recorded capacity of 4 MW, and has been generating since 2019-01-01.
Planning and build timeline
| Application submitted | 2018-08-07 |
| Permission granted | not recorded |
| Operational | 2019-01-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
- Green Belt — Thurrock
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Thurrock’s record on solar
Thurrock has decided 17 solar farms and approved 94%, taking a median of 2.4 months. See every solar farm decision in Thurrock →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
London Distribution Park Battery · Operational | 3.8 | 0 km |
Tilbury Green Power Biomass (dedicated) · Operational | 43 | 0.8 km |
Tilbury Docks Wind Onshore · Operational | 12 | 1.6 km |
Thurrock Flexible Generation Plant Battery · Operational | 150 | 2.4 km |
Barvills Solar Farm Solar Photovoltaics · Operational | 5 | 4.9 km |
Mucking Gas 2 Landfill Scheme Landfill Gas · Operational | 3.8 | 5.8 km |
Mucking Gas 3 Landfill Scheme Landfill Gas · Operational | 3.9 | 5.8 km |
Ockendon 'B' Landfill Scheme Landfill Gas · Operational | 4.5 | 5.9 km |
How big is Tilbury LCY2?
Tilbury LCY2 has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Tilbury LCY2?
REPD records the operator as Amazon UK Services/ Push Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Tilbury LCY2 approved and built?
The application was submitted on 2018-08-07. REPD does not record a grant date. The site became operational on 2019-01-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6723.
Novarly Parcel · official public data, read properly · parcel.novarly.com