Lag Farm

Lag Farm is operational in North Somerset with a recorded capacity of 1 MW, and has been generating since 2020-01-01.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2020-01-01
Solar Photovoltaics
Technology
Yeo Valley Farms
North Somerset
Authority
England

Planning and build timeline

Application submitted2019-12-11
Permission granted2020-01-27
2 months after submission
Operational2020-01-01

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Somerset’s record on solar

North Somerset has decided 39 solar farms and approved 95%, taking a median of 2.9 months. See every solar farm decision in North Somerset

Other built sites within 15 km

SiteMWDistance
Bristol Airport Solar Farm
Solar Photovoltaics · Under Construction
6.6 km
Iwood Lane Solar Farm
Solar Photovoltaics · Operational
87.6 km
Twin Elm Solar Farm
Solar Photovoltaics · Operational
17.8 km
Congresbury Solar Farm
Solar Photovoltaics · Operational
7.19.3 km
Priddy Road Farm Biomass Boiler (Retrospective)
Biomass (dedicated) · Operational
10.3 km
Shooters Bottom Solar Park
Solar Photovoltaics · Operational
710.6 km
Towerbrook Farm (Banwell Solar Farm)
Solar Photovoltaics · Operational
7.211 km
Shooters Bottom Wind Park
Wind Onshore · Operational
211.1 km

How big is Lag Farm?

Lag Farm has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lag Farm?

REPD records the operator as Yeo Valley Farms. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lag Farm approved and built?

The application was submitted on 2019-12-11. Permission was granted on 2020-01-27, 2 months later. The site became operational on 2020-01-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7795.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council