Novarly ParcelRenewable sites

Renewable sitesCommon Farm

Common Farm

Common Farm is operational in Swindon with a recorded capacity of 4.8 MW, and has been generating since 2016-06-29.

4.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-06-29
Solar Photovoltaics
Technology
Public Power Solutions/ Swindon Borough Council
Swindon
Authority
England

Planning and build timeline

Application submitted2015-07-29
Permission granted2015-10-13
2 months after submission
Operational2016-06-29
9 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Swindon’s record on solar

Swindon has decided 35 solar farms and approved 100%, taking a median of 2.1 months. See every solar farm decision in Swindon

Other built sites within 15 km

SiteMWDistance
Lower Basset Down Farm
Solar Photovoltaics · Operational
10.51.5 km
Mannington Battery Storage Plant
Battery · Operational
49.92.2 km
Building ONE
Solar Photovoltaics · Under Construction
1.22.8 km
Wroughton Airfield Solar Park
Solar Photovoltaics · Operational
412.8 km
Swindon Sewerage Treatment Works
Anaerobic Digestion · Operational
1.23.6 km
Barnfield Solar Park
Solar Photovoltaics · Operational
2.54.3 km
Brindley Close (Extension)
Battery · Under Construction
64.4 km
Wickfield Farm
Solar Photovoltaics · Operational
54.7 km

How big is Common Farm?

Common Farm has a recorded installed capacity of 4.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Common Farm?

REPD records the operator as Public Power Solutions/ Swindon Borough Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Common Farm approved and built?

The application was submitted on 2015-07-29. Permission was granted on 2015-10-13, 2 months later. The site became operational on 2016-06-29, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5527.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council