Mannington Battery Storage Plant
Mannington Battery Storage Plant is operational in Swindon with a recorded capacity of 49.9 MW, and has been generating since 2021-10-01.
Planning and build timeline
| Application submitted | 2017-11-21 |
| Permission granted | 2018-12-07 13 months after submission |
| Operational | 2021-10-01 34 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Swindon’s record on battery storage
Swindon has decided 6 battery storage schemes and approved 100%, taking a median of 6.2 months. See every battery storage scheme decision in Swindon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Swindon Sewerage Treatment Works Anaerobic Digestion · Operational | 1.2 | 1.7 km |
Common Farm Solar Photovoltaics · Operational | 4.8 | 2.2 km |
Barnfield Solar Park Solar Photovoltaics · Operational | 2.5 | 2.3 km |
Brindley Close (Extension) Battery · Under Construction | 6 | 2.3 km |
Lower Basset Down Farm Solar Photovoltaics · Operational | 10.5 | 3.6 km |
Wickfield Farm Solar Photovoltaics · Operational | 5 | 4.1 km |
Spittleborough Farm Solar Photovoltaics · Operational | 12 | 4.7 km |
Wroughton Airfield Solar Park Solar Photovoltaics · Operational | 41 | 4.8 km |
How big is Mannington Battery Storage Plant?
Mannington Battery Storage Plant has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Mannington Battery Storage Plant?
REPD records the operator as Still Waters Green Technology. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Mannington Battery Storage Plant approved and built?
The application was submitted on 2017-11-21. Permission was granted on 2018-12-07, 13 months later. The site became operational on 2021-10-01, 34 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7024.