Barnfield Solar Park

Barnfield Solar Park is operational in Swindon with a recorded capacity of 2.5 MW, and has been generating since 2018-12-10.

2.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2018-12-10
Solar Photovoltaics
Technology
Public Power Solutions
Swindon
Authority
England

Planning and build timeline

Application submitted2016-08-26
Permission granted2016-10-25
2 months after submission
Operational2018-12-10
25 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Swindon’s record on solar

Swindon has decided 35 solar farms and approved 100%, taking a median of 2.1 months. See every solar farm decision in Swindon

Other built sites within 15 km

SiteMWDistance
Brindley Close (Extension)
Battery · Under Construction
60.1 km
Swindon Sewerage Treatment Works
Anaerobic Digestion · Operational
1.20.7 km
Mannington Battery Storage Plant
Battery · Operational
49.92.3 km
Arkwright Road, Groundwell Industrial Estate - Solar Panels
Solar Photovoltaics · Under Construction
0.913.8 km
Common Farm
Solar Photovoltaics · Operational
4.84.3 km
Chapel Farm
Solar Photovoltaics · Operational
54.4 km
Chapel Farm Landfill
Landfill Gas · Operational
34.7 km
Wickfield Farm
Solar Photovoltaics · Operational
55.4 km

How big is Barnfield Solar Park?

Barnfield Solar Park has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Barnfield Solar Park?

REPD records the operator as Public Power Solutions. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Barnfield Solar Park approved and built?

The application was submitted on 2016-08-26. Permission was granted on 2016-10-25, 2 months later. The site became operational on 2018-12-10, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6069.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council