Newcastle International Airport Phase 1 -Solar Farm

Newcastle International Airport Phase 1 -Solar Farm is a 3 MW solar farm under construction in Newcastle upon Tyne. Planning permission was granted on 2 March 2022, 5 months after submission. Operator of record: Newcastle International Airport.

3 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Newcastle International Airport
Newcastle upon Tyne
Authority
England

Planning and build timeline

Application submitted24 September 2021
Permission granted2 March 2022
5 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Newcastle upon Tyne approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Newcastle International Airport Phase 1 -Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Newcastle upon Tyne’s record on solar

Newcastle upon Tyne has decided 40 solar farms and approved 100%, taking a median of 1.7 months. See every solar farm decision in Newcastle upon Tyne

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
1.93.8 km
Solar Photovoltaics · Under Construction
0.537 km
Biomass (dedicated) · Operational
27.78.3 km
Landfill Gas · Operational
18.3 km
Wind Onshore · Operational
48.8 km
Solar Photovoltaics · Under Construction
9.4 km
Landfill Gas · Operational
1.59.8 km
Landfill Gas · Operational
3.89.8 km

How big is Newcastle International Airport Phase 1 -Solar Farm?

Newcastle International Airport Phase 1 -Solar Farm has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Newcastle International Airport Phase 1 -Solar Farm?

REPD records the operator as Newcastle International Airport. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Newcastle International Airport Phase 1 -Solar Farm approved and built?

The application was submitted on 24 September 2021. Permission was granted on 2 March 2022, 5 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9755.