Renewable sitesExcelsior Academy, Denton Road - Solar Panels

Excelsior Academy, Denton Road - Solar Panels

Excelsior Academy, Denton Road - Solar Panels is under construction in Newcastle upon Tyne with a recorded capacity of 0.53 MW.

0.53 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Excelsior Academy
Newcastle upon Tyne
Authority
England

Planning and build timeline

Application submitted2023-07-03
Permission granted2023-08-23
2 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Newcastle upon Tyne’s record on solar

Newcastle upon Tyne has decided 40 solar farms and approved 100%, taking a median of 1.7 months. See every solar farm decision in Newcastle upon Tyne

Other built sites within 15 km

SiteMWDistance
Path Head
Landfill Gas · Operational
12.6 km
Metrocentre Green Car Park, St Michaels Way - Photovoltaic Equipment
Solar Photovoltaics · Under Construction
2.7 km
Burnhills Landfill (L5)
Landfill Gas · Operational
3.84.8 km
Burnhills Landfill Scheme (L4)
Landfill Gas · Operational
1.54.8 km
Regent Street - Solar Photovoltaic Panels
Solar Photovoltaics · Operational
5.9 km
Newcastle International Airport Phase 1 -Solar Farm
Solar Photovoltaics · Under Construction
37 km
Kibblesworth Landfill Site
Landfill Gas · Operational
2.39.8 km
Brenkley Landfill
Landfill Gas · Operational
1.910.5 km

How big is Excelsior Academy, Denton Road - Solar Panels?

Excelsior Academy, Denton Road - Solar Panels has a recorded installed capacity of 0.53 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Excelsior Academy, Denton Road - Solar Panels?

REPD records the operator as Excelsior Academy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Excelsior Academy, Denton Road - Solar Panels approved and built?

The application was submitted on 2023-07-03. Permission was granted on 2023-08-23, 2 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14438.