Novarly ParcelRenewable sites

Renewable sitesLand south of Brick Kiln Road

Land south of Brick Kiln Road

Land south of Brick Kiln Road is operational in South Norfolk with a recorded capacity of 5 MW, and has been generating since 2016-03-17.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-17
Solar Photovoltaics
Technology
Lightsource Renewable Energy
South Norfolk
Authority
England

Planning and build timeline

Application submitted2015-06-04
Permission granted2015-09-03
3 months after submission
Operational2016-03-17
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Norfolk’s record on solar

South Norfolk has decided 28 solar farms and approved 96%, taking a median of 4.2 months. See every solar farm decision in South Norfolk

Other built sites within 15 km

SiteMWDistance
Bracon Ash Solar
Solar Photovoltaics · Under Construction
28.52.8 km
Bracon Ash Solar
Battery · Under Construction
2.8 km
The Everest System
Battery · Operational
0.14.8 km
Land East of White Horse Lane
Solar Photovoltaics · Operational
57 km
Hall Farm Solar park
Solar Photovoltaics · Operational
157.3 km
Avenue Farm
Solar Photovoltaics · Operational
7.39.8 km
New Road Solar Farm
Solar Photovoltaics · Under Construction
510.2 km
Briar Solar Farm
Solar Photovoltaics · Operational
1.910.3 km

How big is Land south of Brick Kiln Road?

Land south of Brick Kiln Road has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land south of Brick Kiln Road?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land south of Brick Kiln Road approved and built?

The application was submitted on 2015-06-04. Permission was granted on 2015-09-03, 3 months later. The site became operational on 2016-03-17, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5285.