Renewable planning › Battery storage › South Norfolk
Battery storage planning in South Norfolk
South Norfolk has decided 12 battery storage schemes and approved 100% of them, taking a median of 4.6 months to decide. Consented capacity: 625 MW. 7 applications still awaiting a decision.
How South Norfolk compares
Against the 137 UK authorities with 5+ battery storage decisions, South Norfolk sits in the 73rd percentile for approval rate (8 points above the England average) and the 65th percentile for speed.
Decisions by year
Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (19)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Mulbarton Road, Keswick - Battery Energy Storage System Greenfield Energy Developments Limited · 2025/2275 | 400 | Application Submitted | 2025-07-25 |
Market Lane And Carr Lane, Great Moulton - Battery Energy Storage System Field Long Stratton Limited · 2025/1689 | 400 | Application Submitted | 2025-06-06 |
Nowhere Lane, Norwich - Battery Energy Storage Albanwise Synergy Limited · 2024/3676 · 4.6 mo to decide | — | Awaiting Construction | 2025-04-28 |
Hill Farm, Wacton Road - Battery Energy Storage System Green Switch Capital Limited · 2025/1152 | 228 | Application Submitted | 2025-04-09 |
Hill Farm, Wacton Road - Battery Energy Storage System Green Switch Capital · 2025/1152 | — | Application Submitted | 2025-04-09 |
Wymondham Road, Bracon Ash - Battery Energy Storage System Green Switch Capital · 2025/0806 | 228 | Application Submitted | 2025-03-31 |
Long Stratton Leisure Centre, Long Stratton - Battery South Norfolk District Council · 2024/2781 · 3.9 mo to decide | 0.3 | Awaiting Construction | 2025-02-18 |
Wymondham Leisure Centre, Norwich Road - BESS South Norfolk and Broadland Council · 2024/2882 · 3.9 mo to decide | 0.3 | Awaiting Construction | 2025-02-18 |
Hall Farm, Hickling Lane - Battery Energy Storage Innova Renewables Developments Limited · 2024/3750 | 400 | Application Submitted | 2024-12-16 |
Hickling Lane, Swainsthorpe -Battery Storage EDF Energy Renewables · 2023/0617 · 6.2 mo to decide | 114 | Awaiting Construction | 2023-09-13 |
Flordon Road, Bracon Ash - Solar Panels & Battery Storage Ralos Projects Limited · 2023/1055 | — | Application Submitted | 2023-04-18 |
Hornsea Project Three - Battery Storage Orsted Power (UK) Limited · 2022/0867 · 8.9 mo to decide | 300 | Awaiting Construction | 2023-01-23 |
Stoke Lane - Battery Energy Storage FPC Electric Land Limited · 2021/2645 · 9.2 mo to decide | 130 | Awaiting Construction | 2022-09-09 |
Colton - Solar photovoltaic farm, Battery storage Pathfinder Clean Energy UK Dev Limited · 2022/0509 · 3.8 mo to decide | 30 | Under Construction | 2022-06-30 |
Aldeby Landfill Site Solar Park Infinis Solar Developments Limited · FUL/2021/0015 · 9 mo to decide | — | Awaiting Construction | 2022-04-08 |
Bracon Ash Solar Luminous Energy Ltd · 2021/0569 · 9.3 mo to decide | — | Under Construction | 2021-12-21 |
Mangreen Hall Lane - Battery Storage Brockwell Energy Limited · 2021/1399 · 2 mo to decide | — | Awaiting Construction | 2021-08-16 |
Norwich Substation Storage Facility Pivot Power · 2018/2017 · 0.2 mo to decide | 49.9 | Awaiting Construction | 2018-11-15 |
The Everest System Connected Energy | 0.1 | Operational | 2008-02-21 |
Does South Norfolk approve battery storage schemes?
Yes — of the 12 battery storage schemes South Norfolk has decided, 100% were approved (12 granted, 0 refused). The UK-wide rate for battery storage is 92%.
How long does a battery storage scheme application take in South Norfolk?
The median time from application to decision is 4.6 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has South Norfolk consented?
625 MW has been consented across 12 approved schemes. A further 7 applications awaits a decision.
Other technologies in South Norfolk
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.