Novarly ParcelRenewable sites

Renewable sitesBower Park Academy - Solar Photovoltaic Panels

Bower Park Academy - Solar Photovoltaic Panels

Bower Park Academy - Solar Photovoltaic Panels is operational in Havering with a recorded capacity of 0.26 MW, and has been generating since 2021-12-26.

0.26 MW
Capacity
as recorded in REPD
Operational
Status
since 2021-12-26
Solar Photovoltaics
Technology
London Borough of Hounslow
Havering
Authority
England

Planning and build timeline

Application submitted2021-01-07
Permission granted2021-10-08
9 months after submission
Operational2021-12-26
3 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Havering’s record on solar

Havering has decided 10 solar farms and approved 80%, taking a median of 2.8 months. See every solar farm decision in Havering

Other built sites within 15 km

SiteMWDistance
Cranham Golf Course Solar Park
Solar Photovoltaics · Operational
2.68.7 km
Ford Motor Company Ltd (Extension)
Wind Onshore · Operational
28.8 km
Dagenham Docks Biogas (Waste AD)
Anaerobic Digestion · Operational
1.49.6 km
East Dagenham Docks AD (AD)
Anaerobic Digestion · Operational
1.49.8 km
Clay Tye Farm Phase 1 - Storage Facility
Battery · Operational
49.59.9 km
Clay Tye Farm Phase 2 - Storage Facility
Battery · Operational
49.59.9 km
Ford Wind Park - Dagenham
Wind Onshore · Operational
5.99.9 km
Riverside Sewage Treatment Works Digestion Plant
Sewage Sludge Digestion · Operational
49.9 km

How big is Bower Park Academy - Solar Photovoltaic Panels?

Bower Park Academy - Solar Photovoltaic Panels has a recorded installed capacity of 0.26 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bower Park Academy - Solar Photovoltaic Panels?

REPD records the operator as London Borough of Hounslow. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bower Park Academy - Solar Photovoltaic Panels approved and built?

The application was submitted on 2021-01-07. Permission was granted on 2021-10-08, 9 months later. The site became operational on 2021-12-26, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9351.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council