Cranham Golf Course Solar Park

Cranham Golf Course Solar Park is an operational 2.6 MW solar farm in Havering, generating since 21 December 2016. Planning permission was granted on 13 August 2015, 14 months after submission. Operator of record: Cranham Golf Course.

2.6 MW
Capacity
as recorded in REPD
Operational
Status
since 21 December 2016
Solar Photovoltaics
Technology
Cranham Golf Course
Havering
Authority
England

Planning and build timeline

Application submitted27 June 2014
Permission granted13 August 2015
14 months after submission
Operational21 December 2016
16 months after consent

Screening a site of your own?

RedlineUK · £39

Havering approves 80% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Cranham Golf Course Solar Park’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Havering’s record on solar

Havering has decided 10 solar farms and approved 80%, taking a median of 2.8 months. See every solar farm decision in Havering

Other built sites within 15 km

SiteMWDistance
Battery · Operational
49.51.1 km
Battery · Operational
49.51.1 km
Solar Photovoltaics · Under Construction
49.93.4 km
Wind Onshore · Operational
14 km
Solar Photovoltaics · Operational
384.4 km
Landfill Gas · Operational
8.54.5 km
Solar Photovoltaics · Under Construction
49.94.5 km
Battery · Under Construction
4.5 km

How big is Cranham Golf Course Solar Park?

Cranham Golf Course Solar Park has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cranham Golf Course Solar Park?

REPD records the operator as Cranham Golf Course. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cranham Golf Course Solar Park approved and built?

The application was submitted on 27 June 2014. Permission was granted on 13 August 2015, 14 months later. The site became operational on 21 December 2016, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2117.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode