Renewable sites › Boddington Reservoir
Boddington Reservoir
Boddington Reservoir is operational in West Northamptonshire with a recorded capacity of 1.5 MW, and has been generating since 2014-04-24.
Planning and build timeline
| Application submitted | 2011-03-07 |
| Permission granted | 2011-12-15 9 months after submission |
| Operational | 2014-04-24 28 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
West Northamptonshire’s record on onshore wind
West Northamptonshire has decided 12 onshore wind schemes and approved 67%, taking a median of 17.6 months. See every onshore wind scheme decision in West Northamptonshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Culworth House Solar Farm Solar Photovoltaics · Operational | 3 | 8.8 km |
Weddington Farm Solar Photovoltaics · Operational | 2.1 | 10.1 km |
Feldon Vale Solar Farm Solar Photovoltaics · Operational | 49.9 | 10.7 km |
Daventry Biomass (dedicated) · Operational | 1 | 11.1 km |
Solar Farm at Fields Farm (Phase 1) Solar Photovoltaics · Operational | 5 | 11.9 km |
Royal Oak Way South - Solar Array Solar Photovoltaics · Operational | 1.66 | 12 km |
The Elms Solar Photovoltaics · Operational | 10.4 | 12.2 km |
Eastfields Farm, Deppers Bridge - Solar Farm Solar Photovoltaics · Under Construction | 34.8 | 12.2 km |
How big is Boddington Reservoir?
Boddington Reservoir has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Boddington Reservoir?
REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Boddington Reservoir approved and built?
The application was submitted on 2011-03-07. Permission was granted on 2011-12-15, 9 months later. The site became operational on 2014-04-24, 28 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3732.
Novarly Parcel · official public data, read properly · parcel.novarly.com