Boddington Reservoir is an operational 1.5 MW onshore wind farm in West Northamptonshire, generating since 24 April 2014. Planning permission was granted on 15 December 2011, 9 months after submission. Operator of record: Unknown.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 24 April 2014
Wind Onshore
Technology
Unknown
West Northamptonshire
Authority
England

Planning and build timeline

Application submitted7 March 2011
Permission granted15 December 2011
9 months after submission
Operational24 April 2014
28 months after consent

Screening a site of your own?

RedlineUK · £39

West Northamptonshire approves 67% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Boddington Reservoir’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Northamptonshire’s record on onshore wind

West Northamptonshire has decided 12 onshore wind schemes and approved 67%, taking a median of 17.6 months. See every onshore wind scheme decision in West Northamptonshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
38.8 km
Solar Photovoltaics · Operational
2.110.1 km
Solar Photovoltaics · Operational
49.910.7 km
Biomass (dedicated) · Operational
111.1 km
Solar Photovoltaics · Operational
511.9 km
Solar Photovoltaics · Operational
1.6612 km
Solar Photovoltaics · Operational
10.412.2 km
Solar Photovoltaics · Under Construction
34.812.2 km

How big is Boddington Reservoir?

Boddington Reservoir has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Boddington Reservoir?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Boddington Reservoir approved and built?

The application was submitted on 7 March 2011. Permission was granted on 15 December 2011, 9 months later. The site became operational on 24 April 2014, 28 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3732.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode