Renewable sites › Royal Oak Way South - Solar Array
Royal Oak Way South - Solar Array
Royal Oak Way South - Solar Array is operational in West Northamptonshire with a recorded capacity of 1.66 MW, and has been generating since 2023-10-01.
Planning and build timeline
| Application submitted | 2022-02-22 |
| Permission granted | 2022-05-24 3 months after submission |
| Operational | 2023-10-01 16 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
West Northamptonshire’s record on solar
West Northamptonshire has decided 61 solar farms and approved 92%, taking a median of 2.9 months. See every solar farm decision in West Northamptonshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Daventry Biomass (dedicated) · Operational | 1 | 0.9 km |
Kilsby Landfill Scheme Landfill Gas · Operational | 1 | 6.5 km |
Watford Lodge Wind Onshore · Operational | 12.5 | 8.6 km |
M1 J18 Wind Turbines Wind Onshore · Operational | 4 | 9.8 km |
East Haddon - Solar Photovoltaic System Solar Photovoltaics · Under Construction | 2 | 11 km |
Crick Road Solar Photovoltaics · Under Construction | 49.9 | 11.2 km |
Weston Landfill Site Landfill Gas · Operational | 2 | 11.6 km |
Boddington Reservoir Wind Onshore · Operational | 1.5 | 12 km |
How big is Royal Oak Way South - Solar Array?
Royal Oak Way South - Solar Array has a recorded installed capacity of 1.66 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Royal Oak Way South - Solar Array?
REPD records the operator as Cummins Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Royal Oak Way South - Solar Array approved and built?
The application was submitted on 2022-02-22. Permission was granted on 2022-05-24, 3 months later. The site became operational on 2023-10-01, 16 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10790.
Novarly Parcel · official public data, read properly · parcel.novarly.com