Novarly ParcelRenewable sites

Renewable sitesCulworth House Solar Farm

Culworth House Solar Farm

Culworth House Solar Farm is operational in West Northamptonshire with a recorded capacity of 3 MW, and has been generating since 2015-01-15.

3 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-01-15
Solar Photovoltaics
Technology
Private Developer
West Northamptonshire
Authority
England

Planning and build timeline

Application submitted2011-03-11
Permission granted2013-03-04
24 months after submission
Operational2015-01-15
22 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Northamptonshire’s record on solar

West Northamptonshire has decided 61 solar farms and approved 92%, taking a median of 2.9 months. See every solar farm decision in West Northamptonshire

Other built sites within 15 km

SiteMWDistance
Hall Farm
Solar Photovoltaics · Operational
5.17.2 km
Boddington Reservoir
Wind Onshore · Operational
1.58.8 km
Turweston Solar Farm
Solar Photovoltaics · Operational
16.710.9 km
Handley Park
Solar Photovoltaics · Operational
512.6 km
Shacks Barn Solar Farm
Solar Photovoltaics · Operational
513.7 km
Land South West Of Apollo Business Park
Solar Photovoltaics · Operational
1.714.9 km

How big is Culworth House Solar Farm?

Culworth House Solar Farm has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Culworth House Solar Farm?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Culworth House Solar Farm approved and built?

The application was submitted on 2011-03-11. Permission was granted on 2013-03-04, 24 months later. The site became operational on 2015-01-15, 22 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1582.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council