Blakenhall Park Solar Farm

Blakenhall Park Solar Farm is operational in East Staffordshire with a recorded capacity of 1.8 MW, and has been generating since 2015-09-15.

1.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-09-15
Solar Photovoltaics
Technology
Mercer Farming
East Staffordshire
Authority
England

Planning and build timeline

Application submitted2015-04-01
Permission granted2015-06-06
2 months after submission
Operational2015-09-15
3 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Staffordshire’s record on solar

East Staffordshire has decided 17 solar farms and approved 100%, taking a median of 2.7 months. See every solar farm decision in East Staffordshire

Other built sites within 15 km

SiteMWDistance
Drakelow Renewable Energy Centre
Advanced Conversion Technologies · Under Construction
156.3 km
Drakelow Solar Farm
Solar Photovoltaics · Operational
56.3 km
Park Lane
Solar Photovoltaics · Operational
18.6 km
Huddlesford Farm
Solar Photovoltaics · Operational
18.8 km
Rolleston Park Farm
Solar Photovoltaics · Operational
18.79.7 km
Land at Coton Park Colliery
Solar Photovoltaics · Operational
2.59.9 km
Bretby Power
Landfill Gas · Operational
1.611.2 km
Hawthorn Farm - Solar photovoltaic panels
Solar Photovoltaics · Under Construction
1012 km

How big is Blakenhall Park Solar Farm?

Blakenhall Park Solar Farm has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Blakenhall Park Solar Farm?

REPD records the operator as Mercer Farming. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Blakenhall Park Solar Farm approved and built?

The application was submitted on 2015-04-01. Permission was granted on 2015-06-06, 2 months later. The site became operational on 2015-09-15, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5148.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council