Bretby Power is an operational 1.6 MW landfill gas site in South Derbyshire, generating since 1 September 2001. REPD does not record the planning grant date. Operator of record: Natural Power.

1.6 MW
Capacity
as recorded in REPD
Operational
Status
since 1 September 2001
Landfill Gas
Technology
Natural Power
South Derbyshire
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 September 2001

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in South Derbyshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bretby Power’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
2.53.3 km
Solar Photovoltaics · Operational
0.243.4 km
Solar Photovoltaics · Operational
54.8 km
Advanced Conversion Technologies · Under Construction
154.9 km
Solar Photovoltaics · Operational
55.1 km
Solar Photovoltaics · Operational
56.6 km
Solar Photovoltaics · Operational
166.7 km
Solar Photovoltaics · Operational
37.2 km

How big is Bretby Power?

Bretby Power has a recorded installed capacity of 1.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bretby Power?

REPD records the operator as Natural Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bretby Power approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 September 2001.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 742.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode