Renewable sites › Bretby Power
Bretby Power
Bretby Power is operational in South Derbyshire with a recorded capacity of 1.6 MW, and has been generating since 2001-09-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2001-09-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
- Green Belt — South Derbyshire
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Land at Coton Park Colliery Solar Photovoltaics · Operational | 2.5 | 3.3 km |
Midland Lead, Kiln Way - Solar Photovoltaic Panels Solar Photovoltaics · Operational | 0.24 | 3.4 km |
Drakelow Solar Farm Solar Photovoltaics · Operational | 5 | 4.8 km |
Drakelow Renewable Energy Centre Advanced Conversion Technologies · Under Construction | 15 | 4.9 km |
Short Hazel Solar Farm Solar Photovoltaics · Operational | 5 | 5.1 km |
Shortheath Solar Park Solar Photovoltaics · Operational | 5 | 6.6 km |
Prestop Park Farm Solar Photovoltaics · Operational | 16 | 6.7 km |
Land at Ingles Hill Farm Solar Photovoltaics · Operational | 3 | 7.2 km |
How big is Bretby Power?
Bretby Power has a recorded installed capacity of 1.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bretby Power?
REPD records the operator as Natural Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bretby Power approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2001-09-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 742.