Drakelow Renewable Energy Centre is under construction in South Derbyshire with a recorded capacity of 15 MW.

15 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Advanced Conversion Technologies
Technology
Future Earth Energy
South Derbyshire
Authority
England

Planning and build timeline

Application submitted2015-06-30
Permission granted2015-11-24
5 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Drakelow Solar Farm
Solar Photovoltaics · Operational
50.2 km
Land at Coton Park Colliery
Solar Photovoltaics · Operational
2.54.3 km
Bretby Power
Landfill Gas · Operational
1.64.9 km
Blakenhall Park Solar Farm
Solar Photovoltaics · Operational
1.86.3 km
Midland Lead, Kiln Way - Solar Photovoltaic Panels
Solar Photovoltaics · Operational
0.247.4 km
Rolleston Park Farm
Solar Photovoltaics · Operational
18.77.5 km
Shortheath Solar Park
Solar Photovoltaics · Operational
58.5 km
Short Hazel Solar Farm
Solar Photovoltaics · Operational
59.7 km

How big is Drakelow Renewable Energy Centre?

Drakelow Renewable Energy Centre has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Drakelow Renewable Energy Centre?

REPD records the operator as Future Earth Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Drakelow Renewable Energy Centre approved and built?

The application was submitted on 2015-06-30. Permission was granted on 2015-11-24, 5 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5423.