Drakelow Solar Farm is operational in South Derbyshire with a recorded capacity of 5 MW, and has been generating since 2016-03-15.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-15
Solar Photovoltaics
Technology
BlackRock
South Derbyshire
Authority
England

Planning and build timeline

Application submitted2015-04-08
Permission granted2015-06-24
3 months after submission
Operational2016-03-15
9 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Derbyshire’s record on solar

South Derbyshire has decided 12 solar farms and approved 67%, taking a median of 4.9 months. See every solar farm decision in South Derbyshire

Other built sites within 15 km

SiteMWDistance
Drakelow Renewable Energy Centre
Advanced Conversion Technologies · Under Construction
150.2 km
Land at Coton Park Colliery
Solar Photovoltaics · Operational
2.54.2 km
Bretby Power
Landfill Gas · Operational
1.64.8 km
Blakenhall Park Solar Farm
Solar Photovoltaics · Operational
1.86.3 km
Midland Lead, Kiln Way - Solar Photovoltaic Panels
Solar Photovoltaics · Operational
0.247.3 km
Rolleston Park Farm
Solar Photovoltaics · Operational
18.77.6 km
Shortheath Solar Park
Solar Photovoltaics · Operational
58.4 km
Short Hazel Solar Farm
Solar Photovoltaics · Operational
59.6 km

How big is Drakelow Solar Farm?

Drakelow Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Drakelow Solar Farm?

REPD records the operator as BlackRock. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Drakelow Solar Farm approved and built?

The application was submitted on 2015-04-08. Permission was granted on 2015-06-24, 3 months later. The site became operational on 2016-03-15, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5145.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council