Hawthorn Farm - Solar photovoltaic panels

Hawthorn Farm - Solar photovoltaic panels is under construction in South Derbyshire with a recorded capacity of 10 MW.

10 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Unknown
South Derbyshire
Authority
England

Planning and build timeline

Application submitted2021-03-25
Permission granted2022-02-22
11 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Derbyshire’s record on solar

South Derbyshire has decided 12 solar farms and approved 67%, taking a median of 4.9 months. See every solar farm decision in South Derbyshire

Other built sites within 15 km

SiteMWDistance
Aston House Solar Farm
Solar Photovoltaics · Operational
202.8 km
Rolleston Park Farm
Solar Photovoltaics · Operational
18.73.4 km
Morton House (Marchington)
Solar Photovoltaics · Operational
6.24.6 km
Land of Green Lane
Solar Photovoltaics · Operational
5.85 km
Holtwood Farm
Solar Photovoltaics · Operational
57.1 km
Somersal Mill Farm
Solar Photovoltaics · Operational
2.68 km
Marchington Solar Farm
Solar Photovoltaics · Operational
4.38.4 km
Toyota Solar Farm
Solar Photovoltaics · Operational
4.69.1 km

How big is Hawthorn Farm - Solar photovoltaic panels?

Hawthorn Farm - Solar photovoltaic panels has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hawthorn Farm - Solar photovoltaic panels?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hawthorn Farm - Solar photovoltaic panels approved and built?

The application was submitted on 2021-03-25. Permission was granted on 2022-02-22, 11 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8856.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council