Novarly ParcelRenewable sites

Renewable sitesWillersey solar farm

Willersey solar farm

Willersey solar farm is operational in Cotswold with a recorded capacity of 1 MW, and has been generating since 2019-02-01.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2019-02-01
Battery
Technology
Belectric UK
Cotswold
Authority
England

Planning and build timeline

Application submitted2016-11-22
Permission granted2016-12-23
1 months after submission
Operational2019-02-01
25 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
The Rainbows Solar Farm
Solar Photovoltaics · Operational
42 km
Plant Produce - Solar PV panels
Solar Photovoltaics · Operational
0.153.2 km
Mount Farm
Solar Photovoltaics · Operational
224.7 km
Northwick Estate (Extension)
Solar Photovoltaics · Operational
2.24.9 km
Springhill Solar Park (Northwick)
Solar Photovoltaics · Operational
55 km
Norton Hall
Solar Photovoltaics · Operational
2.86.6 km
Littleton Solar Farm
Battery · Operational
6.8 km
Littleton Solar Farm
Solar Photovoltaics · Operational
306.8 km

How big is Willersey solar farm?

Willersey solar farm has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Willersey solar farm?

REPD records the operator as Belectric UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Willersey solar farm approved and built?

The application was submitted on 2016-11-22. Permission was granted on 2016-12-23, 1 months later. The site became operational on 2019-02-01, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6869.