Berry Court Solar Farm - energy storage is an operational 1 MW battery storage site in Basingstoke and Deane, generating since 1 December 2017. REPD does not record the planning grant date. Operator of record: Anesco.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2017
Battery
Technology
Anesco
Basingstoke and Deane
Authority
England

Planning and build timeline

Application submitted7 June 2016
Permission grantednot recorded
Operational1 December 2017

Screening a site of your own?

RedlineUK · £39

Basingstoke and Deane approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Berry Court Solar Farm - energy storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Basingstoke and Deane’s record on battery storage

Basingstoke and Deane has decided 7 battery storage schemes and approved 100%, taking a median of 9.1 months. See every battery storage scheme decision in Basingstoke and Deane

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
4.20.3 km
Solar Photovoltaics · Operational
2.81.5 km
Battery · Operational
1003.1 km
EfW Incineration · Operational
86.3 km
Anaerobic Digestion · Operational
1.26.5 km
Solar Photovoltaics · Operational
58.3 km
Solar Photovoltaics · Under Construction
17.8710.3 km
Solar Photovoltaics · Operational
1.710.3 km

How big is Berry Court Solar Farm - energy storage?

Berry Court Solar Farm - energy storage has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Berry Court Solar Farm - energy storage?

REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Berry Court Solar Farm - energy storage approved and built?

The application was submitted on 7 June 2016. REPD does not record a grant date. The site became operational on 1 December 2017.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6900.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode