Battery storage planning in Basingstoke and Deane
Basingstoke and Deane has decided 7 battery storage schemes and approved 100% of them, taking a median of 9.1 months to decide. Consented capacity: 208 MW. 1 application still awaiting a decision.
⚠️ Small caseload (7 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Basingstoke and Deane compares
Against the 137 UK authorities with 5+ battery storage decisions, Basingstoke and Deane sits in the 73rd percentile for approval rate (8 points above the England average) and the 18th percentile for speed.
Decisions by year
Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (9)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Withy Place, Bramley Road - Battery Energy Storage Root Power South Limited · 24/01913/FUL · 10 mo to decide | 50 | Awaiting Construction | 2025-07-02 |
Ash Lane, Little London - Battery Storage Facility AGR Group · 24/00075/FUL · 15.2 mo to decide | — | Awaiting Construction | 2025-04-18 |
Brickledons Farm, Clappers Farm Road - Battery Energy Storage Facility Brickledons Farm · 24/02371/FUL · 4.3 mo to decide | — | Awaiting Construction | 2025-03-11 |
Bramley Frith Solar Farm Bramley Solar Limited · 20/03403/FUL · 26.3 mo to decide | — | Awaiting Construction | 2023-02-13 |
Ash Lane, Little London - Battery Storage Bramley BESS Limited · 22/01797/FUL · 7.5 mo to decide | 57 | Awaiting Construction | 2023-02-09 |
Minchens Lane Battery Storage Facility Penso Power (BW ESS) · 21/00349/FUL · 8.3 mo to decide | 100 | Operational | 2021-10-08 |
Basing Road Eco-Economix · 21/02412/FUL | 20 | Application Submitted | 2021-07-20 |
Chineham Battery Energy Storage Facility Camborne Energy Storage · 16/02534/FUL | 15 | Application Withdrawn | 2017-01-04 |
Berry Court Solar Farm - energy storage Anesco · 16/01901/FUL | 1 | Operational | 2016-06-07 |
Does Basingstoke and Deane approve battery storage schemes?
Yes — of the 7 battery storage schemes Basingstoke and Deane has decided, 100% were approved (7 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a battery storage scheme application take in Basingstoke and Deane?
The median time from application to decision is 9.1 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has Basingstoke and Deane consented?
208 MW has been consented across 7 approved schemes. A further 1 application awaits a decision.
Other technologies in Basingstoke and Deane
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.