Renewable sites › South Cathkin Landfill Site
South Cathkin Landfill Site
South Cathkin Landfill Site is an operational 7.4 MW landfill gas site in South Lanarkshire, generating since 1 January 2006. Planning permission was granted on 9 March 2005, 10 months after submission. Operator of record: CLP Envirogas.
Planning and build timeline
| Application submitted | 17 May 2004 |
| Permission granted | 9 March 2005 10 months after submission |
| Operational | 1 January 2006 10 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in South Lanarkshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with South Cathkin Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 3 | 1.5 km |
Solar Photovoltaics · Under Construction | 0.94 | 3.2 km |
Solar Photovoltaics · Operational | 0.24 | 4 km |
Anaerobic Digestion · Operational | 5 | 5.7 km |
Advanced Conversion Technologies · Operational | 10 | 5.7 km |
Landfill Gas · Operational | 3.9 | 6.6 km |
Solar Photovoltaics · Operational | 0.18 | 7.4 km |
EfW Incineration · Operational | — | 8.2 km |
How big is South Cathkin Landfill Site?
South Cathkin Landfill Site has a recorded installed capacity of 7.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates South Cathkin Landfill Site?
REPD records the operator as CLP Envirogas. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was South Cathkin Landfill Site approved and built?
The application was submitted on 17 May 2004. Permission was granted on 9 March 2005, 10 months later. The site became operational on 1 January 2006, 10 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 726.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode