Garves Mountain Farm is an operational 15 MW onshore wind farm in Causeway Coast and Glens, generating since 1 January 2009. Planning permission was granted on 20 November 2006, 41 months after submission. Operator of record: Gravis Capital Management.

15 MW
Capacity
as recorded in REPD
Operational
Status
since 1 January 2009
Wind Onshore
Technology
Gravis Capital Management
Causeway Coast and Glens
Authority
Northern Ireland

Planning and build timeline

Application submitted11 June 2003
Permission granted20 November 2006
41 months after submission
Operational1 January 2009
25 months after consent

Screening a site of your own?

RedlineUK · £39

Causeway Coast and Glens approves 97% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Garves Mountain Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Causeway Coast and Glens’s record on onshore wind

Causeway Coast and Glens has decided 37 onshore wind schemes and approved 97%, taking a median of 27.4 months. See every onshore wind scheme decision in Causeway Coast and Glens

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
185.7 km
Solar Photovoltaics · Operational
5.96.3 km
Solar Photovoltaics · Operational
258 km
Wind Onshore · Operational
27.68.1 km
Wind Onshore · Operational
2.39.8 km
Wind Onshore · Operational
6.99.8 km
Wind Onshore · Operational
37.513 km

How big is Garves Mountain Farm?

Garves Mountain Farm has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Garves Mountain Farm?

REPD records the operator as Gravis Capital Management. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Garves Mountain Farm approved and built?

The application was submitted on 11 June 2003. Permission was granted on 20 November 2006, 41 months later. The site became operational on 1 January 2009, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3191.