BAE Samlesbury Aerodrome

BAE Samlesbury Aerodrome is an operational 2 MW solar farm in South Ribble, generating since 1 May 2015. Planning permission was granted on 18 September 2014, 3 months after submission. Operator of record: British Aerospace Defence Limited.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 May 2015
Solar Photovoltaics
Technology
British Aerospace Defence Limited
South Ribble
Authority
England

Planning and build timeline

Application submitted23 June 2014
Permission granted18 September 2014
3 months after submission
Operational1 May 2015
7 months after consent

Screening a site of your own?

RedlineUK · £39

South Ribble approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with BAE Samlesbury Aerodrome’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Ribble’s record on solar

South Ribble has decided 8 solar farms and approved 100%, taking a median of 1.4 months. See every solar farm decision in South Ribble

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
4.23.6 km
Solar Photovoltaics · Operational
2.93.8 km
Landfill Gas · Operational
2.36.9 km
Solar Photovoltaics · Operational
0.38.4 km
Battery · Under Construction
9.4 km
Solar Photovoltaics · Operational
0.39.4 km
Battery · Under Construction
512.4 km
Anaerobic Digestion · Operational
1.912.9 km

How big is BAE Samlesbury Aerodrome?

BAE Samlesbury Aerodrome has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates BAE Samlesbury Aerodrome?

REPD records the operator as British Aerospace Defence Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was BAE Samlesbury Aerodrome approved and built?

The application was submitted on 23 June 2014. Permission was granted on 18 September 2014, 3 months later. The site became operational on 1 May 2015, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2179.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode