Renewable sites › Brookhouse Mill
Brookhouse Mill
Brookhouse Mill is operational in Preston with a recorded capacity of 0.3 MW, and has been generating since 2020-10-21.
Planning and build timeline
| Application submitted | 2020-03-18 |
| Permission granted | 2020-07-21 4 months after submission |
| Operational | 2020-10-21 3 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Preston’s record on solar
Preston has decided 10 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Preston →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Oakfield Farm - extension Solar Photovoltaics · Operational | 1.7 | 5.7 km |
Clifton Marsh Energy Landfill Gas · Operational | 3.3 | 5.8 km |
Oakfield Farm Solar Photovoltaics · Operational | 5 | 5.9 km |
Fell View Farm (Phase 2) Solar Photovoltaics · Operational | 2.9 | 6.9 km |
Land at Fell View Farm (Phase 1) Solar Photovoltaics · Operational | 4.2 | 7.1 km |
Clifton Marsh Waste Water Treatment Works Battery · Operational | 2 | 7.2 km |
Clifton Marsh Wastewater Treatment Works Solar Photovoltaics · Operational | 1.3 | 7.2 km |
Farington Waste Recovery Park (Waste AD) Anaerobic Digestion · Operational | 1.9 | 7.3 km |
How big is Brookhouse Mill?
Brookhouse Mill has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Brookhouse Mill?
REPD records the operator as Plumbs. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Brookhouse Mill approved and built?
The application was submitted on 2020-03-18. Permission was granted on 2020-07-21, 4 months later. The site became operational on 2020-10-21, 3 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7976.