Solar planning in South Ribble

South Ribble has decided 8 solar farms and approved 100% of them, taking a median of 1.4 months to decide. Consented capacity: 12 MW.

100%
Approved
8 granted · 0 refused
1.4 mo
Median decision
UK 2.3 mo
12 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

How South Ribble compares

Against the 298 UK authorities with 5+ solar decisions, South Ribble sits in the 77th percentile for approval rate (7 points above the England average) and the 97th percentile for speed.

Decisions by year

35Approved — 1 (2014)114Approved — 1 (2015)115Approved — 2 (2023)223Approved — 3 (2024)324Approved — 1 (2025)125
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (9)

SchemeMWStatusDecided
Navigator Tissue UK, Badger Road - Solar PV Panels
Navigator Tissue UK Limited · 07/2025/00057/PAP · 1.1 mo to decide
1.1Awaiting Construction2025-03-05
Four Oaks Road, Walton Summit - Solar Panels
Cornerstone Group · 07/2024/00772/SPD · 1.1 mo to decide
0.7Awaiting Construction2024-11-25
Leyland Trucks Limited, Croston Road - Solar Panels
Leyland Trucks Limited · 07/2024/00268/PAP · 1.4 mo to decide
4Awaiting Construction2024-05-21
Globe Mill, Midge Hall Lane - Solar Panels
Cactus Energy · 07/2024/00206/PAP · 1.1 mo to decide
0.16Awaiting Construction2024-04-18
Banksfield Place, Walton Summit Industrial Estate - Solar Panels
Abrdn Property Holdings Limited · 07/2023/00471/SPD · 1.4 mo to decide
0.94Awaiting Construction2023-08-30
Vodafone Building, Carr Lane - Solar Panels
Vodafone · 07/2023/00216/PAP · 1.8 mo to decide
0.22Awaiting Construction2023-05-16
Carver Hay, moss lane
Navitas Project · 07/2015/1494/FUL · 2.5 mo to decide
2.5Operational2015-12-15
AB Inbev UK
Perpetum Sun · 07/2015/1627/FUL · 1 mo to decide
2.2Abandoned2015-11-11
BAE Samlesbury Aerodrome
British Aerospace Defence Limited · 07/2014/0430/FUL · 2.9 mo to decide
2Operational2014-09-18

Does South Ribble approve solar farms?

Yes — of the 8 solar farms South Ribble has decided, 100% were approved (8 granted, 0 refused). The UK-wide rate for solar is 93%.

How long does a solar farm application take in South Ribble?

The median time from application to decision is 1.4 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has South Ribble consented?

12 MW has been consented across 8 approved schemes. There are no applications currently awaiting a decision.

Other technologies in South Ribble

Battery storage in South RibbleOnshore wind in South Ribble

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com