Renewable sitesFarington Waste Recovery Park (Waste AD)

Farington Waste Recovery Park (Waste AD)

Farington Waste Recovery Park (Waste AD) is an operational 1.9 MW anaerobic digestion plant in South Ribble, generating since 1 September 2010. Planning permission was granted on 22 November 2006, 4 months after submission. Operator of record: Global Renewables Lancashire.

1.9 MW
Capacity
as recorded in REPD
Operational
Status
since 1 September 2010
Anaerobic Digestion
Technology
Global Renewables Lancashire
South Ribble
Authority
England

Planning and build timeline

Application submitted17 July 2006
Permission granted22 November 2006
4 months after submission
Operational1 September 2010
45 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in South Ribble: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Farington Waste Recovery Park (Waste AD)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
51.1 km
Solar Photovoltaics · Operational
2.52.9 km
Landfill Gas · Operational
1.33.5 km
Landfill Gas · Operational
3.37 km
Solar Photovoltaics · Operational
0.37.3 km
Solar Photovoltaics · Operational
1.37.9 km
Solar Photovoltaics · Operational
3.28.1 km
Battery · Operational
28.1 km

How big is Farington Waste Recovery Park (Waste AD)?

Farington Waste Recovery Park (Waste AD) has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Farington Waste Recovery Park (Waste AD)?

REPD records the operator as Global Renewables Lancashire. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Farington Waste Recovery Park (Waste AD) approved and built?

The application was submitted on 17 July 2006. Permission was granted on 22 November 2006, 4 months later. The site became operational on 1 September 2010, 45 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 224.