Renewable sites › Farington Waste Recovery Park (Waste AD)
Farington Waste Recovery Park (Waste AD)
Farington Waste Recovery Park (Waste AD) is an operational 1.9 MW anaerobic digestion plant in South Ribble, generating since 1 September 2010. Planning permission was granted on 22 November 2006, 4 months after submission. Operator of record: Global Renewables Lancashire.
Planning and build timeline
| Application submitted | 17 July 2006 |
| Permission granted | 22 November 2006 4 months after submission |
| Operational | 1 September 2010 45 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in South Ribble: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Farington Waste Recovery Park (Waste AD)’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — South Ribble
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Battery · Under Construction | 5 | 1.1 km |
Solar Photovoltaics · Operational | 2.5 | 2.9 km |
Landfill Gas · Operational | 1.3 | 3.5 km |
Landfill Gas · Operational | 3.3 | 7 km |
Solar Photovoltaics · Operational | 0.3 | 7.3 km |
Solar Photovoltaics · Operational | 1.3 | 7.9 km |
Solar Photovoltaics · Operational | 3.2 | 8.1 km |
Battery · Operational | 2 | 8.1 km |
How big is Farington Waste Recovery Park (Waste AD)?
Farington Waste Recovery Park (Waste AD) has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Farington Waste Recovery Park (Waste AD)?
REPD records the operator as Global Renewables Lancashire. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Farington Waste Recovery Park (Waste AD) approved and built?
The application was submitted on 17 July 2006. Permission was granted on 22 November 2006, 4 months later. The site became operational on 1 September 2010, 45 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 224.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode