Renewable sitesFarington Waste Recovery Park (Waste AD)

Farington Waste Recovery Park (Waste AD)

Farington Waste Recovery Park (Waste AD) is operational in South Ribble with a recorded capacity of 1.9 MW, and has been generating since 2010-09-01.

1.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2010-09-01
Anaerobic Digestion
Technology
Global Renewables Lancashire
South Ribble
Authority
England

Planning and build timeline

Application submitted2006-07-17
Permission granted2006-11-22
4 months after submission
Operational2010-09-01
45 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
The Glowhouse
Battery · Under Construction
51.1 km
Carver Hay, moss lane
Solar Photovoltaics · Operational
2.52.9 km
Ulnes Walton Energy
Landfill Gas · Operational
1.33.5 km
Clifton Marsh Energy
Landfill Gas · Operational
3.37 km
Brookhouse Mill
Solar Photovoltaics · Operational
0.37.3 km
Clifton Marsh Wastewater Treatment Works
Solar Photovoltaics · Operational
1.37.9 km
Clifton Marsh Wastewater Treatment Works
Solar Photovoltaics · Operational
3.28.1 km
Clifton Marsh Waste Water Treatment Works
Battery · Operational
28.1 km

How big is Farington Waste Recovery Park (Waste AD)?

Farington Waste Recovery Park (Waste AD) has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Farington Waste Recovery Park (Waste AD)?

REPD records the operator as Global Renewables Lancashire. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Farington Waste Recovery Park (Waste AD) approved and built?

The application was submitted on 2006-07-17. Permission was granted on 2006-11-22, 4 months later. The site became operational on 2010-09-01, 45 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 224.