Balle Street

Balle Street is under construction in Blackburn with Darwen.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
STOR Power
Blackburn with Darwen
Authority
England

Planning and build timeline

Application submitted2017-10-10
Permission granted2021-11-05
49 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Withnell LFS
Landfill Gas · Operational
2.34.4 km
ENWL Training Academy
Solar Photovoltaics · Operational
0.35.5 km
Hyndburn Wind Farm
Wind Onshore · Operational
246.1 km
BAE Samlesbury Aerodrome
Solar Photovoltaics · Operational
29.4 km
Whinney Hill Waste Disposal Site
Landfill Gas · Operational
1.29.8 km
Whinney Hill II Energy
Landfill Gas · Operational
1.810.2 km
Horncliffe Quarry
Landfill Gas · Operational
112.6 km
Rossendale Power
Landfill Gas · Operational
1.612.6 km

How big is Balle Street?

REPD does not record an installed capacity for Balle Street.

Who operates Balle Street?

REPD records the operator as STOR Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Balle Street approved and built?

The application was submitted on 2017-10-10. Permission was granted on 2021-11-05, 49 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7115.