Novarly ParcelRenewable sites

Renewable sitesAvonmouth Port

Avonmouth Port

Avonmouth Port is operational in Bristol, City of with a recorded capacity of 6 MW, and has been generating since 2007-08-20.

6 MW
Capacity
as recorded in REPD
Operational
Status
since 2007-08-20
Wind Onshore
Technology
Bristol Port Authority
Bristol, City of
Authority
England

Planning and build timeline

Application submitted2005-08-08
Permission granted2005-12-16
4 months after submission
Operational2007-08-20
20 months after consent

Bristol, City of’s record on onshore wind

Bristol, City of has decided 6 onshore wind schemes and approved 100%, taking a median of 4.5 months. See every onshore wind scheme decision in Bristol, City of

Other built sites within 15 km

SiteMWDistance
Avonmouth Low Carbon Energy Facility - Phase 2
Advanced Conversion Technologies · Operational
6.51.1 km
Avonmouth
Advanced Conversion Technologies · Operational
6.51.1 km
Accolade Wines
Wind Onshore · Operational
2.51.2 km
Avonmouth Port - extension
Wind Onshore · Operational
91.3 km
Avonmouth
Solar Photovoltaics · Operational
4.22 km
Avonmouth Wind Power
Wind Onshore · Operational
8.22.3 km
Bristol STW (Waste AD)
Anaerobic Digestion · Operational
102.5 km
Severn Road
Battery · Operational
323.2 km

How big is Avonmouth Port?

Avonmouth Port has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Avonmouth Port?

REPD records the operator as Bristol Port Authority. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Avonmouth Port approved and built?

The application was submitted on 2005-08-08. Permission was granted on 2005-12-16, 4 months later. The site became operational on 2007-08-20, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3194.