Renewable sites › Accolade Wines
Accolade Wines
Accolade Wines is operational in Bristol, City of with a recorded capacity of 2.5 MW, and has been generating since 2019-06-15.
Planning and build timeline
| Application submitted | 2017-04-21 |
| Permission granted | 2017-09-01 4 months after submission |
| Operational | 2019-06-15 21 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Bristol, City of’s record on onshore wind
Bristol, City of has decided 6 onshore wind schemes and approved 100%, taking a median of 4.5 months. See every onshore wind scheme decision in Bristol, City of →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Avonmouth Low Carbon Energy Facility - Phase 2 Advanced Conversion Technologies · Operational | 6.5 | 0.8 km |
Avonmouth Advanced Conversion Technologies · Operational | 6.5 | 0.8 km |
Avonmouth Port Wind Onshore · Operational | 6 | 1.2 km |
Avonmouth Wind Power Wind Onshore · Operational | 8.2 | 1.2 km |
Avonmouth Solar Photovoltaics · Operational | 4.2 | 1.2 km |
Bristol STW (Waste AD) Anaerobic Digestion · Operational | 10 | 1.4 km |
Avonmouth Port - extension Wind Onshore · Operational | 9 | 1.7 km |
Severn Road Battery · Operational | 32 | 2 km |
How big is Accolade Wines?
Accolade Wines has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Accolade Wines?
REPD records the operator as Clean Earth Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Accolade Wines approved and built?
The application was submitted on 2017-04-21. Permission was granted on 2017-09-01, 4 months later. The site became operational on 2019-06-15, 21 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6293.