Novarly ParcelRenewable sites

Renewable sitesAccolade Wines

Accolade Wines

Accolade Wines is an operational 2.5 MW onshore wind farm in Bristol, City of, generating since 15 June 2019. Planning permission was granted on 1 September 2017, 4 months after submission. Operator of record: Clean Earth Energy.

2.5 MW
Capacity
as recorded in REPD
Operational
Status
since 15 June 2019
Wind Onshore
Technology
Clean Earth Energy
Bristol, City of
Authority
England

Planning and build timeline

Application submitted21 April 2017
Permission granted1 September 2017
4 months after submission
Operational15 June 2019
21 months after consent

Screening a site of your own?

RedlineUK · £39

Bristol, City of approves 100% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Accolade Wines’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bristol, City of’s record on onshore wind

Bristol, City of has decided 6 onshore wind schemes and approved 100%, taking a median of 4.5 months. See every onshore wind scheme decision in Bristol, City of

Other built sites within 15 km

SiteMWDistance
Advanced Conversion Technologies · Operational
6.50.8 km
Advanced Conversion Technologies · Operational
6.50.8 km
Wind Onshore · Operational
61.2 km
Wind Onshore · Operational
8.21.2 km
Solar Photovoltaics · Operational
4.21.2 km
Anaerobic Digestion · Operational
101.4 km
Wind Onshore · Operational
91.7 km
Battery · Operational
322 km

How big is Accolade Wines?

Accolade Wines has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Accolade Wines?

REPD records the operator as Clean Earth Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Accolade Wines approved and built?

The application was submitted on 21 April 2017. Permission was granted on 1 September 2017, 4 months later. The site became operational on 15 June 2019, 21 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6293.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode