Renewable sites › Warrington Home Solar Scheme
Warrington Home Solar Scheme
Warrington Home Solar Scheme is operational in Warrington with a recorded capacity of 5.3 MW, and has been generating since 2016-01-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2016-01-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Warrington’s record on solar
Warrington has decided 27 solar farms and approved 81%, taking a median of 1.8 months. See every solar farm decision in Warrington →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Former St Michaels Golf Course Solar Photovoltaics · Under Construction | 1 | 3 km |
Arpley Landfill Scheme 'B' Landfill Gas · Operational | 7.9 | 3.2 km |
Arpley Landfill Scheme 'A' Landfill Gas · Operational | 7.9 | 3.2 km |
Amazon Omega Business Park Solar Photovoltaics · Operational | 1.5 | 4.3 km |
Daresbury Science Park - Solar Array Solar Photovoltaics · Operational | 0.56 | 5.3 km |
Fiddlers Ferry Power Station - Battery storage Battery · Under Construction | 150 | 5.9 km |
Butchersfield Landfill Site Landfill Gas · Operational | 3 | 8 km |
Risley Sets 13 & 14 Landfill Gas · Operational | 2.1 | 8.4 km |
How big is Warrington Home Solar Scheme?
Warrington Home Solar Scheme has a recorded installed capacity of 5.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Warrington Home Solar Scheme?
REPD records the operator as Warrington Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Warrington Home Solar Scheme approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2016-01-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1892.
Novarly Parcel · official public data, read properly · parcel.novarly.com