Renewable sites › Langton Farm Solar park
Langton Farm Solar park
Langton Farm Solar park is an operational 4.4 MW solar farm in Pembrokeshire, generating since 3 December 2015. Planning permission was granted on 19 November 2013, 8 months after submission. Operator of record: Lightsource Renewable Energy.
Planning and build timeline
| Application submitted | 18 March 2013 |
| Permission granted | 19 November 2013 8 months after submission |
| Operational | 3 December 2015 24 months after consent |
Screening a site of your own?
Pembrokeshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Langton Farm Solar park’s recorded coordinate — swap in your own postcode or coordinates.
Pembrokeshire’s record on solar
Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 6 | 11.4 km |
Landfill Gas · Operational | 2.4 | 12.2 km |
Solar Photovoltaics · Operational | 10.8 | 13.1 km |
How big is Langton Farm Solar park?
Langton Farm Solar park has a recorded installed capacity of 4.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Langton Farm Solar park?
REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Langton Farm Solar park approved and built?
The application was submitted on 18 March 2013. Permission was granted on 19 November 2013, 8 months later. The site became operational on 3 December 2015, 24 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1661.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode