Altham Business Park - Solar Panels is an operational 1.18 MW solar farm in Hyndburn, generating since 1 October 2022. Planning permission was granted on 16 December 2022, 15 months after submission. Operator of record: The Senator Group Altham.

1.18 MW
Capacity
as recorded in REPD
Operational
Status
since 1 October 2022
Solar Photovoltaics
Technology
The Senator Group Altham
Hyndburn
Authority
England

Planning and build timeline

Application submitted29 September 2021
Permission granted16 December 2022
15 months after submission
Operational1 October 2022

Screening a site of your own?

RedlineUK · £39

Hyndburn approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Altham Business Park - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Hyndburn’s record on solar

Hyndburn has decided 12 solar farms and approved 100%, taking a median of 2.1 months. See every solar farm decision in Hyndburn

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
1.82.7 km
Landfill Gas · Operational
1.23.1 km
Wind Onshore · Operational
4.53.3 km
Wind Onshore · Operational
7.53.3 km
Solar Photovoltaics · Under Construction
0.226.6 km
Landfill Gas · Operational
1.87.6 km
Landfill Gas · Operational
1.98 km
Landfill Gas · Operational
1.98.2 km

How big is Altham Business Park - Solar Panels?

Altham Business Park - Solar Panels has a recorded installed capacity of 1.18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Altham Business Park - Solar Panels?

REPD records the operator as The Senator Group Altham. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Altham Business Park - Solar Panels approved and built?

The application was submitted on 29 September 2021. Permission was granted on 16 December 2022, 15 months later. The site became operational on 1 October 2022.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10692.