Renewable sites › Whinney Hill Waste Disposal Site
Whinney Hill Waste Disposal Site
Whinney Hill Waste Disposal Site is operational in Hyndburn with a recorded capacity of 1.2 MW, and has been generating since 1999-01-08.
Planning and build timeline
| Application submitted | 1997-12-02 |
| Permission granted | 1998-03-04 3 months after submission |
| Operational | 1999-01-08 10 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Green Belt — Hyndburn
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Whinney Hill II Energy Landfill Gas · Operational | 1.8 | 0.4 km |
Altham Business Park - Solar Panels Solar Photovoltaics · Operational | 1.18 | 3.1 km |
Hameldon Hill extension Wind Onshore · Operational | 7.5 | 4.3 km |
New Barn Farm Wind Onshore · Operational | 4.5 | 4.5 km |
ENWL Training Academy Solar Photovoltaics · Operational | 0.3 | 5.5 km |
Hyndburn Wind Farm Wind Onshore · Operational | 24 | 6.1 km |
Total Food Services, North Road - Solar Panels Solar Photovoltaics · Under Construction | 0.22 | 8.2 km |
Balle Street Battery · Under Construction | — | 9.8 km |
How big is Whinney Hill Waste Disposal Site?
Whinney Hill Waste Disposal Site has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Whinney Hill Waste Disposal Site?
REPD records the operator as Combined Landfill Projects (CLP). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Whinney Hill Waste Disposal Site approved and built?
The application was submitted on 1997-12-02. Permission was granted on 1998-03-04, 3 months later. The site became operational on 1999-01-08, 10 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 730.