Novarly ParcelRenewable sites

Renewable sitesQueen's Park Road Energy

Queen's Park Road Energy

Queen's Park Road Energy is an operational 1.8 MW landfill gas site in Burnley, generating since 1 September 2000. Planning permission was granted on 20 August 1992, 5 months after submission. Operator of record: Combined Landfill Projects (CLP).

1.8 MW
Capacity
as recorded in REPD
Operational
Status
since 1 September 2000
Landfill Gas
Technology
Combined Landfill Projects (CLP)
Burnley
Authority
England

Planning and build timeline

Application submitted26 March 1992
Permission granted20 August 1992
5 months after submission
Operational1 September 2000
96 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Burnley: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Queen's Park Road Energy’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
1.90.4 km
Landfill Gas · Operational
1.90.6 km
Battery · Under Construction
701.2 km
Landfill Gas · Operational
25.2 km
Wind Onshore · Operational
4.55.6 km
Wind Onshore · Operational
7.55.9 km
Wind Onshore · Operational
9.67.4 km
Wind Onshore · Operational
167.4 km

How big is Queen's Park Road Energy?

Queen's Park Road Energy has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Queen's Park Road Energy?

REPD records the operator as Combined Landfill Projects (CLP). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Queen's Park Road Energy approved and built?

The application was submitted on 26 March 1992. Permission was granted on 20 August 1992, 5 months later. The site became operational on 1 September 2000, 96 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 731.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode