Total Food Services, North Road - Solar Panels
Total Food Services, North Road - Solar Panels is under construction in Ribble Valley with a recorded capacity of 0.22 MW.
Planning and build timeline
| Application submitted | 2022-11-22 |
| Permission granted | not recorded |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Altham Business Park - Solar Panels Solar Photovoltaics · Operational | 1.18 | 6.6 km |
Whinney Hill II Energy Landfill Gas · Operational | 1.8 | 8.1 km |
Whinney Hill Waste Disposal Site Landfill Gas · Operational | 1.2 | 8.2 km |
New Barn Farm Wind Onshore · Operational | 4.5 | 9.7 km |
Hameldon Hill extension Wind Onshore · Operational | 7.5 | 9.8 km |
ENWL Training Academy Solar Photovoltaics · Operational | 0.3 | 10.1 km |
Queen's Park Road Energy Landfill Gas · Operational | 1.8 | 12.2 km |
Queens Park Energy Landfill Gas · Operational | 1.9 | 12.6 km |
How big is Total Food Services, North Road - Solar Panels?
Total Food Services, North Road - Solar Panels has a recorded installed capacity of 0.22 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Total Food Services, North Road - Solar Panels?
REPD records the operator as Total Food Services Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Total Food Services, North Road - Solar Panels approved and built?
The application was submitted on 2022-11-22. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12758.