Novarly ParcelRenewable sites

Renewable sitesQueens Park Energy

Queens Park Energy

Queens Park Energy is an operational 1.9 MW landfill gas site in Burnley, generating since 1 November 2000. REPD does not record the planning grant date. Operator of record: Unknown.

1.9 MW
Capacity
as recorded in REPD
Operational
Status
since 1 November 2000
Landfill Gas
Technology
Unknown
Burnley
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 November 2000

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Burnley: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Queens Park Energy’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
1.90.5 km
Landfill Gas · Operational
1.80.6 km
Battery · Under Construction
700.7 km
Landfill Gas · Operational
25.4 km
Wind Onshore · Operational
4.56.2 km
Wind Onshore · Operational
7.56.5 km
Wind Onshore · Operational
9.67.2 km
Wind Onshore · Operational
167.2 km

How big is Queens Park Energy?

Queens Park Energy has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Queens Park Energy?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Queens Park Energy approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 November 2000.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 627.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode