Renewable sitesQueens Park Energy

Queens Park Energy

Queens Park Energy is operational in Burnley with a recorded capacity of 1.9 MW, and has been generating since 2000-11-01.

1.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2000-11-01
Landfill Gas
Technology
Unknown
Burnley
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2000-11-01

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Rowley
Landfill Gas · Operational
1.90.5 km
Queen's Park Road Energy
Landfill Gas · Operational
1.80.6 km
Widow Hill, Balderstone Lane - Battery Energy Storage System
Battery · Under Construction
700.7 km
Deerplay Landfill Site
Landfill Gas · Operational
25.4 km
New Barn Farm
Wind Onshore · Operational
4.56.2 km
Hameldon Hill extension
Wind Onshore · Operational
7.56.5 km
Coal Clough Wind Farm Repowering
Wind Onshore · Operational
167.2 km
Coal Clough Wind Farm
Wind Onshore · Operational
9.67.2 km

How big is Queens Park Energy?

Queens Park Energy has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Queens Park Energy?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Queens Park Energy approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2000-11-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 627.