Pepperhill Solar Farm - Solar Farm & Battery Storage
Pepperhill Solar Farm - Solar Farm & Battery Storage is an operational 23 MW solar farm in Shropshire. Planning permission was granted on 7 June 2023, 11 months after submission. Operator of record: Low Carbon.
Planning and build timeline
| Application submitted | 22 July 2022 |
| Permission granted | 7 June 2023 11 months after submission |
| Operational | not recorded |
Screening a site of your own?
Shropshire approves 94% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Pepperhill Solar Farm - Solar Farm & Battery Storage’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
- Green Belt — Shropshire
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Shropshire’s record on solar
Shropshire has decided 68 solar farms and approved 94%, taking a median of 3.2 months. See every solar farm decision in Shropshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Battery · Operational | — | 0 km |
Solar Photovoltaics · Operational | 15.8 | 2.8 km |
Battery · Operational | — | 2.8 km |
Solar Photovoltaics · Operational | 5.8 | 9 km |
Solar Photovoltaics · Operational | 5 | 9.2 km |
EfW Incineration · Operational | 8 | 10.2 km |
Anaerobic Digestion · Operational | 1.2 | 11.1 km |
Anaerobic Digestion · Operational | 2.2 | 11.2 km |
How big is Pepperhill Solar Farm - Solar Farm & Battery Storage?
Pepperhill Solar Farm - Solar Farm & Battery Storage has a recorded installed capacity of 23 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Pepperhill Solar Farm - Solar Farm & Battery Storage?
REPD records the operator as Low Carbon. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pepperhill Solar Farm - Solar Farm & Battery Storage approved and built?
The application was submitted on 22 July 2022. Permission was granted on 7 June 2023, 11 months later. REPD does not record an operational date.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11799.