Renewable sites › Pepperhill Solar Farm - Solar Farm & Battery Storage
Pepperhill Solar Farm - Solar Farm & Battery Storage
Pepperhill Solar Farm - Solar Farm & Battery Storage is operational in Shropshire.
Planning and build timeline
| Application submitted | 2022-07-22 |
| Permission granted | 2023-06-07 11 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
- Green Belt — Shropshire
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Shropshire’s record on battery storage
Shropshire has decided 15 battery storage schemes and approved 100%, taking a median of 3.8 months. See every battery storage scheme decision in Shropshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Pepperhill Solar Farm - Solar Farm & Battery Storage Solar Photovoltaics · Operational | 23 | 0 km |
Albrighton Solar farm Battery · Operational | — | 2.8 km |
Albrighton Solar farm Solar Photovoltaics · Operational | 15.8 | 2.8 km |
Jaguar Land Rover Solar Photovoltaics · Operational | 5.8 | 9 km |
Land East of Lawn Lane Solar Photovoltaics · Operational | 5 | 9.2 km |
Wolverhampton EfW EfW Incineration · Operational | 8 | 10.2 km |
Swancote Farm Anaerobic Digestion · Operational | 1.2 | 11.1 km |
Swancote Farm AD (Farm AD) Anaerobic Digestion · Operational | 2.2 | 11.2 km |
How big is Pepperhill Solar Farm - Solar Farm & Battery Storage?
REPD does not record an installed capacity for Pepperhill Solar Farm - Solar Farm & Battery Storage.
Who operates Pepperhill Solar Farm - Solar Farm & Battery Storage?
REPD records the operator as Low Carbon. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pepperhill Solar Farm - Solar Farm & Battery Storage approved and built?
The application was submitted on 2022-07-22. Permission was granted on 2023-06-07, 11 months later. REPD does not record an operational date.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11800.
Novarly Parcel · official public data, read properly · parcel.novarly.com