Billingham Chemical Works is an operational 12 MW energy-from-waste plant in Stockton-on-Tees, generating since 1 December 2013. Planning permission was granted on 3 September 2010, 3 months after submission. Operator of record: O2N Energy (Billingham) LLP.

12 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2013
EfW Incineration
Technology
O2N Energy (Billingham) LLP
Stockton-on-Tees
Authority
England

Planning and build timeline

Application submitted4 June 2010
Permission granted3 September 2010
3 months after submission
Operational1 December 2013
39 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Stockton-on-Tees: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Billingham Chemical Works’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Operational
20.11 km
EfW Incineration · Operational
101.2 km
EfW Incineration · Operational
19.21.2 km
EfW Incineration · Operational
211.2 km
Anaerobic Digestion · Operational
4.82.1 km
Biomass (dedicated) · Under Construction
402.8 km
Solar Photovoltaics · Operational
0.183.2 km
Solar Photovoltaics · Operational
54.6 km

How big is Billingham Chemical Works?

Billingham Chemical Works has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Billingham Chemical Works?

REPD records the operator as O2N Energy (Billingham) LLP. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Billingham Chemical Works approved and built?

The application was submitted on 4 June 2010. Permission was granted on 3 September 2010, 3 months later. The site became operational on 1 December 2013, 39 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6210.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode