Billingham Chemical Works is operational in Stockton-on-Tees with a recorded capacity of 12 MW, and has been generating since 2013-12-01.

12 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-12-01
EfW Incineration
Technology
O2N Energy (Billingham) LLP
Stockton-on-Tees
Authority
England

Planning and build timeline

Application submitted2010-06-04
Permission granted2010-09-03
3 months after submission
Operational2013-12-01
39 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Haverton Hill Incinerator
EfW Incineration · Operational
20.11 km
Teesside EfW
EfW Incineration · Operational
19.21.2 km
Teesside EfW (extension)
EfW Incineration · Operational
101.2 km
North East Energy Recovery Centre (adjacent to Teesside EfW)
EfW Incineration · Operational
211.2 km
Teesside Green Energy Plant (Waste AD)
Anaerobic Digestion · Operational
4.82.1 km
Port Clarence Biomass Plant
Biomass (dedicated) · Under Construction
402.8 km
Albert Road Rooftop Solar Panels
Solar Photovoltaics · Operational
0.183.2 km
Land at Bluehouse Farm
Solar Photovoltaics · Operational
54.6 km

How big is Billingham Chemical Works?

Billingham Chemical Works has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Billingham Chemical Works?

REPD records the operator as O2N Energy (Billingham) LLP. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Billingham Chemical Works approved and built?

The application was submitted on 2010-06-04. Permission was granted on 2010-09-03, 3 months later. The site became operational on 2013-12-01, 39 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6210.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council