Novarly ParcelRenewable sites

Renewable sitesHaverton Hill Incinerator

Haverton Hill Incinerator

Haverton Hill Incinerator is an operational 20.1 MW energy-from-waste plant in Stockton-on-Tees, generating since 12 May 1998. Planning permission was granted on 5 November 1993, 3 months after submission. Operator of record: Cleveland Waste Management Ltd.

20.1 MW
Capacity
as recorded in REPD
Operational
Status
since 12 May 1998
EfW Incineration
Technology
Cleveland Waste Management Ltd
Stockton-on-Tees
Authority
England

Planning and build timeline

Application submitted9 August 1993
Permission granted5 November 1993
3 months after submission
Operational12 May 1998
54 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Stockton-on-Tees: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Haverton Hill Incinerator’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Operational
210.3 km
EfW Incineration · Operational
100.3 km
EfW Incineration · Operational
19.20.3 km
EfW Incineration · Operational
121 km
Anaerobic Digestion · Operational
4.81.7 km
Biomass (dedicated) · Under Construction
402 km
Solar Photovoltaics · Operational
0.182.9 km
Solar Photovoltaics · Operational
54.3 km

How big is Haverton Hill Incinerator?

Haverton Hill Incinerator has a recorded installed capacity of 20.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Haverton Hill Incinerator?

REPD records the operator as Cleveland Waste Management Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Haverton Hill Incinerator approved and built?

The application was submitted on 9 August 1993. Permission was granted on 5 November 1993, 3 months later. The site became operational on 12 May 1998, 54 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 817.