Abbey Fields Farm is operational in Swale with a recorded capacity of 5.3 MW, and has been generating since 2016-03-30.

5.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-30
Solar Photovoltaics
Technology
FR Solar Kent PV
Swale
Authority
England

Planning and build timeline

Application submitted2015-07-08
Permission granted2015-10-30
4 months after submission
Operational2016-03-30
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Swale’s record on solar

Swale has decided 26 solar farms and approved 96%, taking a median of 2.5 months. See every solar farm decision in Swale

Other built sites within 15 km

SiteMWDistance
Cleve Hill Solar Project
Solar Photovoltaics · Operational
3732.4 km
Cleve Hill Solar Project
Battery · Operational
1502.4 km
Old Rides solar Farm
Solar Photovoltaics · Operational
88.6 km
New Rides Wind Farm
Wind Onshore · Operational
8.89 km
Nickle Farm
Solar Photovoltaics · Operational
0.359.2 km
HMP Standford Hill
Wind Onshore · Operational
4.69.2 km
Tonge Corner Farm
Solar Photovoltaics · Operational
229.4 km
Plot 2B EurolinkV
Battery · Under Construction
209.8 km

How big is Abbey Fields Farm?

Abbey Fields Farm has a recorded installed capacity of 5.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Abbey Fields Farm?

REPD records the operator as FR Solar Kent PV. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Abbey Fields Farm approved and built?

The application was submitted on 2015-07-08. Permission was granted on 2015-10-30, 4 months later. The site became operational on 2016-03-30, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5394.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council