Worksop - B&Q

Worksop - B&Q is an operational 2 MW onshore wind farm in Bassetlaw, generating since 21 January 2009. Planning permission was granted on 1 November 2007, 2 months after submission. Operator of record: Ecotricity.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 21 January 2009
Wind Onshore
Technology
Ecotricity
Bassetlaw
Authority
England

Planning and build timeline

Application submitted7 September 2007
Permission granted1 November 2007
2 months after submission
Operational21 January 2009
15 months after consent

Screening a site of your own?

RedlineUK · £39

Bassetlaw approves 40% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Worksop - B&Q’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bassetlaw’s record on onshore wind

Bassetlaw has decided 5 onshore wind schemes and approved 40%, taking a median of 12.4 months. See every onshore wind scheme decision in Bassetlaw

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
275.3 km
Solar Photovoltaics · Operational
14.35.5 km
Solar Photovoltaics · Operational
166.9 km
Solar Photovoltaics · Operational
19.77.7 km
Solar Photovoltaics · Operational
57.9 km
Solar Photovoltaics · Operational
48.3 km
Solar Photovoltaics · Operational
88.7 km
Solar Photovoltaics · Operational
11.39.4 km

How big is Worksop - B&Q?

Worksop - B&Q has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Worksop - B&Q?

REPD records the operator as Ecotricity. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Worksop - B&Q approved and built?

The application was submitted on 7 September 2007. Permission was granted on 1 November 2007, 2 months later. The site became operational on 21 January 2009, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3510.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode