Onshore wind planning in Bassetlaw

Bassetlaw has decided 5 onshore wind schemes and approved 40% of them, taking a median of 12.4 months to decide. Consented capacity: 2 MW. 2 applications still awaiting a decision.

40%
Approved
2 granted · 3 refused
12.4 mo
Median decision
UK 11.5 mo
2 MW
Consented
22 MW refused
2
Appeals
0 allowed on appeal

⚠️ Small caseload (5 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Bassetlaw compares

Against the 75 UK authorities with 5+ onshore wind decisions, Bassetlaw sits in the 12th percentile for approval rate (28 points below the England average) and the 59th percentile for speed.

Decisions by year

35Refused — 1 (2014)114Refused — 1 (2015)115Approved — 1 (2026)126
Approved Refused

Onshore wind decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (9)

SchemeMWStatusDecided
Mill Hill Farm, Greenspotts Lane - Wind Turbine
Mill Hill Farm (Retford) Ltd · 25/01142/FUL · 3.2 mo to decide
0.22Awaiting Construction2026-02-05
Saundby Wind Farm
Partnerships for Renewables · 14/00645/FUL
15Application Withdrawn2015-09-24
Smeath Road Wind Turbines
Private Developer · 14/00853/RSB · 12.4 mo to decide
1Appeal Refused2015-07-20
Cottam wind farm
Prowind UK · 13/00423/FUL
6.9Application Withdrawn2014-12-04
Babworth Estate
Babworth Estate · 14/00237/FUL · 1.8 mo to decide
1Application Refused2014-05-08
Maumhill Wind Farm
EDF · 46/11/00035 · 14.2 mo to decide
14Revised2013-02-28
Cottam Wind Farm
Prowind Cottam Windfarm · 12/09/00001 · 16.9 mo to decide
27.6Revised2010-07-29
Worksop - B&Q
Ecotricity · 1/2/07/528 · 1.8 mo to decide
2Operational2007-11-01
Crow Holt Windfarm
Renewable Energy Systems (RES) · 24/05/00003 · 27.4 mo to decide
20Application Refused2007-07-12

Does Bassetlaw approve onshore wind schemes?

Yes — of the 5 onshore wind schemes Bassetlaw has decided, 40% were approved (2 granted, 3 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Bassetlaw?

The median time from application to decision is 12.4 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Bassetlaw consented?

2 MW has been consented across 2 approved schemes, with 22 MW refused. A further 2 applications awaits a decision.

Other technologies in Bassetlaw

Solar in BassetlawBattery storage in Bassetlaw

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.